0 ratings
AWISZZZ Pets Dog and Cat Gothic Leather Collar Tie Long Lead Chain Strong Durable with Love Lock and Collar Necklace Neck Size Adjustable Collar for Women Pets - Red

AWISZZZ Pets Dog and Cat Gothic Leather Collar Tie Long Lead Chain Strong Durable with Love Lock and Collar Necklace Neck Size Adjustable Collar for

0 ratings Write a review
Out of stock
us Imported from USA store
Our Top Logistics Partners
  • fedex
  • dhl
U-Care Warranty:
None
Select a Plan
fast shipping

Fast
Shipping

free return

Free
Return*

secure packaging

Secure Packaging

100% original products

100% Original Products

pci-dss

PCI DSS Compliance

iso certified

ISO 27001 Certified


paypal payment
visa payment
mastercard payment
Note: Step 1 Voltage Transformer required for using electronics products of US store (110-120). Recommended power converters Buy Now.

Product Details

Shop AWISZZZ Pets Dog and Cat Gothic Leather Collar Tie Long Lead Chain Strong Durable with Love Lock and Collar Necklace Neck Size Adjustable Collar for Women Pets - Red online at a best price in Saint Helena. B0CFY4K8K2
Brand NameAWISZZZ
Breed RecommendationMedium
Dog Breed SizeMedium
Item Length20 Inches (50.8 cm)
ManufacturerAWISZZZ
Pet TypeCat, Dog
UPC768655427640
Manufacturer Part NumberRed
Model NumberRed
Target SpeciesDog
Age Range DescriptionAll Life Stages
Item Dimensions L x W20"L x 2"W (50.8 cm)
Number of Items1
Unit Count1.00 Count
Size2x20 in (558.8 cm)
PatternHearts
ColorRed
Material TypeLeather
Product Care InstructionsClean after Use
Closure TypeBuckle
Embellishment Featureheart lock
Product Dimensions 20 x 2 x 0.2 inches (50.8 x 5.1 x 0.5 cm); 6.4 ounces (181.44 grams)
MaterialLeather
BrandAWISZZZ

Product Description

AWISZZZ Pets Dog and Cat Gothic Leather Collar Tie Long Lead Chain Strong Durable with Love Lock and Collar Necklace Neck Size Adjustable Collar for Women Pets - Red

Important information

  • Limitations : For products shipped internationally, please note that any manufacturer warranty may not be valid; manufacturer service options may not be available; product manuals, instructions, and safety warnings may not be in destination country languages; the products (and accompanying materials) may not be designed in accordance with destination country standards, specifications, and labeling requirements; and the products may not conform to destination country voltage and other electrical standards (requiring use of an adapter or converter if appropriate). The recipient is responsible for assuring that the product can be lawfully imported to the destination country. When ordering from Ubuy or its affiliates, the recipient is the importer of record and must comply with all laws and regulations of the destination country.
  • Not all the products listed on Ubuy are for sale, as Ubuy is a global search engine. Products are subject to export/trade regulations.